This is my archive

Latest News

Offshore Korea Exhibition

November 2014

Calder was represented this month in Korea by Steve Sharp (Sales Director) and Paul Rennie (Process Equipment Sales Manager) for the 2014 oil show in Busan. We and our local partner Firscomp would like to thank all our visitors for coming to the Cald...

Versatile Jetters for Offshore Well Abandonment

September 2014

Calder is conducting final testing on two highly versatile water jetting packages for the offshore oil & gas contracting sector. The main units have a weight of less than 10 tonnes for use on rigs where lifting capacity is restricted and the package ...

Offshore Northern Seas (ONS) Exhibition in Stavanger, Norway

August 2014

Calder’s fifth successful ONS exhibition saw a record number of visitors to our stand. Our new 650 bar chemical injection demonstration unit with a variable stroke plunger pump allowed both our existing and prospective customers to see the latest in ...

BSI Award

July 2014

Calder is proud to announce the award by BSI, the business standards company, of Module H/H1 - Full Quality Assurance Certificate of the Pressure Equipment Directive 97/23/EC to ‘Design, Project Manage, Assemble, Inspect and Test Low Pressure...

Site Trailer High Pressure Jetting Unit

May 2014

One of our standard range of high pressure jetting units is on its way to the Middle East for heat exchanger tube bundle cleaning operations in the petrochemical industry. Our customer needed a cost-effective, low maintenance, mobile solution which w...

Design Solution in a Tank

April 2014

Calder was tasked with solving a customer’s water buffer tank dilemma. Our customer has twelve Calder MultiJet units which were designed to meet the customer’s strict weight limit specifications and to operate where there is a suitable regulated supp...

Multi-purpose High Pressure Well Service Package

March 2014

A Calder 700 bar (90m³/hour) pressure test unit is en route to our customer. Purchased for pipeline fill and pressure test applications, this multi-purpose unit is capable of continuously pumping a range of material including drill cuttings, slurry, ...

Hazardous Area Pump Package for Unmanned Platform

February 2014

With reliability paramount, Calder was tasked with the design and manufacture of a produced water feed pump package for use on an unmanned platform for the Samarang Redevelopment Phase 2 Project in the South China Sea. The unit is mounted in a lig...

Hazardous Area High Temperature Washdown Unit

February 2014

Building on the success of the Calder range of hot wash units, a bespoke high temperature, high pressure unit with the capacity to clean three platform decks simultaneously has recently been delivered and will operate in the Danish sector of the Nort...