To meet the needs of an ever changing market place Calder were recently tasked to find a solution of how to design and transport a 14 tonne diesel driven well service pump system into an area only accessible by helicopters with a 3.5 tonne lift limit. Using creative techniques of design and manufacture, two pump units were built and delivered in a configuration that allows separate air lifts but can be easily & quickly assembled on the remote jobsite ensuring swift deployment.
These projects add to Calder’s already vast reference list of design and build pump packages in either diesel or electric driven format for hazardous or safe area environments worldwide.